Green Mountain TEL-Rjukan
Green Mountain · TEL-Rjukan

- IT live
- 20 MW
- Free to lease
- 2.8 MW
- $ / kW·mo
- $37
- White space
- 223k ft²
Inventory
86% occupiedPower
20 MWlive
2.8 MW to lease · 17.2 MW in use
White space
223k ft²total
10k ft² free · 213k ft² occupied
21k m² · 929 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 42.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$37/kW·mo
4.4¢ industrial · 5.1¢ after PUE 1.15
- Per MW·year
- $443k
- This site · 20 MW
- $8.9M/yr
- 25 kW rack
- $923/mo
1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.4M/yr less.
Norway NO2 · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 100%
- Rack density
- 25 kW
- PUE
- 1.151.00 ideal · 1.60 typical
- Power source
- Statnett. Dual hydro feeds plus on-site diesel. Nearly 100 percent renewable Norwegian grid.
Cooling
Plant
Seawater
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
0.04 L/kWh
this site · 2025 · 7,008 m³/yr at 20 MW
Measured at this building. Green Mountain fjord cooling (no evaporative towers).
Fjord / seawater heat exchange. Closed loop, near-zero freshwater. Mountain-hall or coastal plant.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rjukan, Telemark, Norway
Rjukan, Vestfold og Telemark
59.879°, 8.594° · Europe
Tenants / users
HPE, HPC, supercomputing
Notes
Cradle of Norwegian hydro. High-security colo with HPE HPC. Fjord / river cooling. Pair to Lefdal for west-Norway HPC.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.