Green Mountain SVG-Rennesøy
Green Mountain · SVG-Rennesøy

- IT live
- 16.5 MW
- Free to lease
- 2.3 MW
- $ / kW·mo
- $38
- White space
- 206k ft²
Inventory
86% occupiedPower
16.5 MWlive
2.3 MW to lease · 14.2 MW in use
White space
206k ft²total
13k ft² free · 193k ft² occupied
19k m² · 1,219 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 19.8 MW of the utility feed is cooling, conversion, and house load.
Power cost
$38/kW·mo
4.4¢ industrial · 5.2¢ after PUE 1.18
- Per MW·year
- $455k
- This site · 16.5 MW
- $7.5M/yr
- 12 kW rack
- $455/mo
1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2M/yr less.
Norway NO2 · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2013
- Renewable match
- 100%
- Rack density
- 12 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Statnett. Dual hydro feeds plus on-site diesel. Nearly 100 percent renewable Norwegian grid.
Cooling
Plant
Seawater
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
0.04 L/kWh
this site · 2025 · 5,782 m³/yr at 16.5 MW
Measured at this building. Green Mountain fjord cooling (no evaporative towers).
Fjord / seawater heat exchange. Closed loop, near-zero freshwater. Mountain-hall or coastal plant.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Rennesøy, Rogaland, Norway
Hodneveien 240, 4159 Rennesøy
59.073°, 5.763° · Europe
Tenants / users
Colo, HPC, Microsoft, UpCloud, SIX Stavanger
Notes
Former NATO ammunition mountain hall. Three independent hydro feeds. Fjord cooling, PUE 1.18. 6.5 ms to London. Original Green Mountain site.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.