Expanding
Colocation
Liquid cooling
Tier III

Green Mountain OSL-Hamar

Green Mountain · OSL-Hamar

Green Mountain OSL-Hamar facility
Green Mountain · Source
IT live
50 MW
Free to lease
7 MW
$ / kW·mo
$48
White space
469k ft²

Inventory

86% occupied

Power

50 MWlive

7 MW to lease · 43 MW in use

White space

469k ft²total

29k ft² free · 440k ft² occupied

44k m² · 2,710 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live50 MW
Free to lease7 MW
Utility feed113 MW
Campus / planned90 MW

About 62.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$48/kW·mo

5.6¢ industrial · 6.6¢ after PUE 1.18

Per MW·year
$579k
This site · 50 MW
$29M/yr
20 kW rack
$965/mo
3.2¢ cheapdear 22.4¢

1.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $12M/yr less.

Norway NO1 · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
100%
Rack density
20 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Statnett. Dual hydro feeds plus on-site diesel. Nearly 100 percent renewable Norwegian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hamar, Innlandet, Norway

Hamar, Innlandet

60.794°, 11.068° · Europe

Tenants / users

TikTok / ByteDance

Notes

Single-tenant TikTok / Project Clover EU hall. Hydro-powered. Scaling toward 90 MW. Not multi-tenant colo.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.