Green Mountain OSL-Enebakk
Green Mountain · OSL-Enebakk

- IT live
- 28 MW
- Free to lease
- 3.9 MW
- $ / kW·mo
- $49
- White space
- 469k ft²
Inventory
86% occupiedPower
28 MWlive
3.9 MW to lease · 24.1 MW in use
White space
469k ft²total
20k ft² free · 449k ft² occupied
44k m² · 1,821 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 65.8 MW of the utility feed is cooling, conversion, and house load.
Power cost
$49/kW·mo
5.6¢ industrial · 6.7¢ after PUE 1.20
- Per MW·year
- $589k
- This site · 28 MW
- $16M/yr
- 15 kW rack
- $736/mo
1.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7.1M/yr less.
Norway NO1 · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2020
- Renewable match
- 100%
- Rack density
- 15 kW
- PUE
- 1.201.00 ideal · 1.60 typical
- Power source
- Statnett. Dual hydro feeds plus on-site diesel. Nearly 100 percent renewable Norwegian grid.
Cooling
Plant
Free air
Liquid
Deployed
Rack density
15 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
3Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Enebakk, Akershus, Norway
Enebakk, 20 km east of Oslo
59.713°, 11.145° · Europe
Tenants / users
Hyperscale, colo, enterprise
Notes
Oslo-metro campus. 26.8 MW live (Menon 2025), scaling toward 75-93 MW. Two hydro feeds. Heat-reuse ready. Largest Green Mountain multi-tenant hall.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.