Operational
Colocation
Air cooled
Tier III

GPX Cairo

GPX Global Systems · Cairo

IT live
8 MW
Free to lease
1.4 MW
$ / kW·mo
$72
White space
56k ft²

Inventory

82% occupied

Power

8 MWlive

1.4 MW to lease · 6.6 MW in use

White space

56k ft²total

10k ft² free · 46k ft² occupied

5,161 m² · 929 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live8 MW
Free to lease1.4 MW
Utility feed15 MW
Campus / planned12 MW

About 7 MW of the utility feed is cooling, conversion, and house load.

Power cost

$72/kW·mo

7¢ industrial · 9.8¢ after PUE 1.40

Per MW·year
$858k
This site · 8 MW
$6.9M/yr
8 kW rack
$572/mo
3.2¢ cheapdear 22.4¢

2.2× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3.7M/yr less.

Egypt EEHC · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2011
Renewable match
20%
Rack density
8 kW
Voltage
PUE
1.401.00 ideal · 1.60 typical
Power source
Egyptian Electricity Holding Company. Dual feeds plus on-site generation.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

8 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Liquid-ready suites offered on newer campus halls.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Cairo, Cairo, Egypt

Smart Village / Cairo

30.044°, 31.236° · Africa

Tenants / users

Carriers, cloud, enterprise, CAIX

Notes

Cairo interconnection hub. Red Sea cable-landing adjacency via Alexandria.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.