Google Winschoten
Google · Winschoten
- IT live
- 40 MW
- Remaining
- 20 MW
- $ / kW·mo
- $103
- White space
- 268k ft²
Inventory
67% occupiedPower
60 MWcampus
20 MW to commission · 40 MW in use
White space
402k ft²total
134k ft² free · 268k ft² occupied
37k m² · 12k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 35 MW of the utility feed is cooling, conversion, and house load.
Power cost
$103/kW·mo
12.8¢ industrial · 14.1¢ after PUE 1.10
- Per MW·year
- $1.2M
- This site · 40 MW
- $49M/yr
- 25 kW rack
- $2,570/mo
4.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $37M/yr less.
Groningen / TenneT · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2025
- Renewable match
- 85%
- Rack density
- 25 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- TenneT 380 kV Eemshaven energy port. Dual 380 kV plus on-site diesel. North Sea wind interconnectors and subsea cables.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
10On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Winschoten, Groningen, Netherlands
Hoogebrug 3, Winschoten
53.144°, 7.035° · Europe
Tenants / users
Google Cloud europe-west4
Notes
Third Dutch Google hall. Ground broken 2023, opened 2025. 600 million euro. europe-west4 expansion next to Eemshaven. Complements the Westpoort Groningen hall under construction.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.