Planned
Hyperscale
Air cooled

Google Van Buren Township

Google

Planned IT
1 GW
Remaining
—
$ / kW·mo
$74
White space
—

Inventory

0% occupied

Power

1 GWcampus

0 MW pipeline · 0 MW in use

White space

—total

— free

—

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live—
Remaining—
Utility feed—
Campus / planned1 GW

Power cost

$74/kW·mo

7.8¢ industrial · 10.1¢ after PUE —

Per MW·year
$888k
This site · 1 GW
$888M/yr
3.2¢ cheapdear 22.4¢

2.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $524M/yr less.

Consumers Energy · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cooling design not published by the operator for this site; typed air as the neutral default.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Van Buren Township, Michigan, United States

42.221°, -83.484° · North America

Tenants / users

Google

Notes

Listed as in development (Van Buren Township, Michigan) on Google's official data center locations page; typed planned because Google gives no construction stage. Capacity, investment and timing not published there. Coordinates: OSM relation 558333 (town center, approximate). Source: https://datacenters.google/locations/ Update 2026-10-26: Van Buren Township Planning Commission approved the final site plan 5-1 on Oct 14 2026 (Project Cannoli); six buildings on 150 of 282 acres; 20-year DTE supply contract approved by Michigan regulators Oct 1; expected to start drawing power by late 2027 and ramp to 1 GW within a year. Source: https://planetdetroit.org/2026/10/google-data-center-van-buren-approval/

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.