Under construction
Hyperscale
Liquid cooling
Tier III

Google Canelones

Google · Parque de las Ciencias

Google Canelones facility
Google · Source
Planned IT
56 MW
Remaining
56 MW
$ / kW·mo
$82
White space
140k ft²

Inventory

0% occupied

Power

56 MWcampus

56 MW pipeline · 0 MW in use

White space

140k ft²total

140k ft² free · occupied

13k m² · 13k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining56 MW
Utility feed
Campus / planned56 MW

Power cost

$82/kW·mo

10¢ industrial · 11.2¢ after PUE 1.12

Per MW·year
$981k
This site · 56 MW
$55M/yr
40 kW rack
$3,270/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $37M/yr less.

UTE · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2027
Renewable match
95%
Rack density
40 kW
Voltage
PUE
1.121.00 ideal · 1.60 typical
Power source
Uruguayan grid — already ~98% renewable (wind/hydro/solar). US$850m campus.

Cooling

Plant

Closed-loop liquid

Liquid

Deployed

Rack density

40 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Closed-loop liquid after community water objections forced a net-positive water pledge.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Canelones, Canelones, Uruguay

Camino de los Horneros, Parque de las Ciencias, Canelones

-34.750°, -56.000° · South America

Tenants / users

Google Cloud

Notes

Google's Uruguay AI hub. Completes in phases through 2028. Set a regional precedent on water.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.