Planned
Hyperscale
Air cooled

Google Tulsa

Google

Planned IT
—
Remaining
—
$ / kW·mo
$61
White space
—

Power

IT live—
Remaining—
Utility feed—
Campus / planned—

Power cost

$61/kW·mo

6.4¢ industrial · 8.3¢ after PUE —

Per MW·year
$729k
This site
—
3.2¢ cheapdear 22.4¢

2.0× the cheapest market (Iceland Landsvirkjun).

Oklahoma industrial · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cooling design not published by the operator for this site; typed air as the neutral default.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Tulsa, Oklahoma, United States

36.156°, -95.993° · North America

Tenants / users

Google

Notes

Listed as in development (Tulsa, Oklahoma) on Google's official data center locations page; typed planned because Google gives no construction stage. Capacity, investment and timing not published there. Coordinates: OSM relation 184985 (town center, approximate). Source: https://datacenters.google/locations/

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.