Google Cloud Toronto
Google · northamerica-northeast2
- IT live
- 36 MW
- Remaining
- 24 MW
- $ / kW·mo
- $87
- White space
- 268k ft²
Inventory
60% occupiedPower
60 MWcampus
24 MW to commission · 36 MW in use
White space
446k ft²total
179k ft² free · 268k ft² occupied
41k m² · 17k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 39 MW of the utility feed is cooling, conversion, and house load.
Power cost
$87/kW·mo
10.6¢ industrial · 11.9¢ after PUE 1.12
- Per MW·year
- $1M
- This site · 36 MW
- $37M/yr
- 25 kW rack
- $2,167/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $26M/yr less.
Toronto Hydro / IESO · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2021
- Renewable match
- 85%
- Rack density
- 25 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Toronto Hydro / Hydro One / IESO. Dual feeds plus on-site diesel. Nuclear-plus-hydro Ontario mix.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Toronto, Ontario, Canada
Greater Toronto (AZ undisclosed)
43.720°, -79.380° · North America
Tenants / users
Google Cloud
Notes
northamerica-northeast2. Second Canadian Google region. Completes the Toronto cloud triangle with AWS ca-central-1 overflow and Azure Canada Central.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.