Expanding
Hyperscale
Liquid cooling
Tier III

Google Cloud Toronto

Google · northamerica-northeast2

IT live
36 MW
Remaining
24 MW
$ / kW·mo
$87
White space
268k ft²

Inventory

60% occupied

Power

60 MWcampus

24 MW to commission · 36 MW in use

White space

446k ft²total

179k ft² free · 268k ft² occupied

41k m² · 17k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live36 MW
Remaining24 MW
Utility feed75 MW
Campus / planned60 MW

About 39 MW of the utility feed is cooling, conversion, and house load.

Power cost

$87/kW·mo

10.6¢ industrial · 11.9¢ after PUE 1.12

Per MW·year
$1M
This site · 36 MW
$37M/yr
25 kW rack
$2,167/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $26M/yr less.

Toronto Hydro / IESO · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2021
Renewable match
85%
Rack density
25 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
Toronto Hydro / Hydro One / IESO. Dual feeds plus on-site diesel. Nuclear-plus-hydro Ontario mix.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Toronto, Ontario, Canada

Greater Toronto (AZ undisclosed)

43.720°, -79.380° · North America

Tenants / users

Google Cloud

Notes

northamerica-northeast2. Second Canadian Google region. Completes the Toronto cloud triangle with AWS ca-central-1 overflow and Azure Canada Central.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.