Operational
Hyperscale
Air cooled
Tier III

Google The Dalles

Google · The Dalles

IT live
180 MW
Remaining
40 MW
$ / kW·mo
$35
White space
900k ft²

Inventory

82% occupied

Power

220 MWcampus

40 MW to commission · 180 MW in use

White space

1.1M ft²total

200k ft² free · 900k ft² occupied

102k m² · 19k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live180 MW
Remaining40 MW
Utility feed220 MW
Campus / planned220 MW

About 40 MW of the utility feed is cooling, conversion, and house load.

Power cost

$35/kW·mo

4.4¢ industrial · 4.8¢ after PUE 1.10

Per MW·year
$424k
This site · 180 MW
$76M/yr
15 kW rack
$530/mo
3.2¢ cheapdear 22.4¢

1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $21M/yr less.

BPA / Mid-C · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2006
Renewable match
90%
Rack density
15 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
Mid-Columbia hydro via BPA.

Cooling

Plant

Evaporative

Liquid

Not deployed

Rack density

15 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Evaporative cooling using Columbia River water rights. Google's first custom data center.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

The Dalles, Oregon, United States

The Dalles, OR

45.605°, -121.201° · North America

Tenants / users

Google

Notes

The original Google custom campus. Hydro-heavy, evaporative-cooled.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.