Operational
Hyperscale
Liquid cooling
Tier III

Google Sydney

Google · Australia-Southeast1

IT live
120 MW
Remaining
0 MW
$ / kW·mo
$116
White space
429k ft²

Inventory

100% occupied

Power

120 MWcampus

0 MW to commission · 120 MW in use

White space

429k ft²total

free · 429k ft² occupied

40k m²

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live120 MW
Remaining0 MW
Utility feed150 MW
Campus / planned120 MW

About 30 MW of the utility feed is cooling, conversion, and house load.

Power cost

$116/kW·mo

14.2¢ industrial · 15.9¢ after PUE 1.12

Per MW·year
$1.4M
This site · 120 MW
$167M/yr
25 kW rack
$2,902/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $130M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
90%
Rack density
25 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
Ausgrid / Endeavour plus Google PPAs.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

TPU liquid in AI halls; evaporative on older buildings.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Sydney, New South Wales, Australia

Greater Sydney, NSW

-33.870°, 150.920° · Oceania

Tenants / users

Google Cloud

Notes

Google's Australia-Southeast1 region. ~120 MW tracked AI/cloud IT.

Operator site