Under construction
Hyperscale
Liquid cooling
Tier III

Google Skien

Google · Skien

Planned IT
240 MW
Remaining
240 MW
$ / kW·mo
$35
White space
750k ft²

Inventory

0% occupied

Power

240 MWcampus

240 MW pipeline · 0 MW in use

White space

750k ft²total

750k ft² free · occupied

70k m² · 70k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining240 MW
Utility feed
Campus / planned240 MW

Power cost

$35/kW·mo

4.4¢ industrial · 4.8¢ after PUE 1.10

Per MW·year
$424k
This site · 240 MW
$102M/yr
30 kW rack
$1,060/mo
3.2¢ cheapdear 22.4¢

1.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $28M/yr less.

Norway NO2 · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
100%
Rack density
30 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
Statnett. Dual hydro feeds plus on-site diesel. Nearly 100 percent renewable Norwegian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Skien, Telemark, Norway

Skien, Telemark

59.209°, 9.609° · Europe

Tenants / users

Google

Notes

Google's second Nordic campus after Hamina. 240 MW AI/mixed. Hydro-powered Telemark. Complements Hamina seawater plant already in the index.