Operational
Hyperscale
Liquid cooling
Tier III

Google Cloud Seoul

Google · Seoul

IT live
36 MW
Remaining
19 MW
$ / kW·mo
$88
White space
113k ft²

Inventory

65% occupied

Power

55 MWcampus

19 MW to commission · 36 MW in use

White space

172k ft²total

59k ft² free · 113k ft² occupied

16k m² · 5,516 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live36 MW
Remaining19 MW
Utility feed68.8 MW
Campus / planned55 MW

About 32.8 MW of the utility feed is cooling, conversion, and house load.

Power cost

$88/kW·mo

10.8¢ industrial · 12.1¢ after PUE 1.12

Per MW·year
$1.1M
This site · 36 MW
$38M/yr
30 kW rack
$2,649/mo
3.2¢ cheapdear 22.4¢

3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $27M/yr less.

KEPCO · utility tariff × PUE, not colo list price.

Redundancy
N+2
Opened
2020
Renewable match
40%
Rack density
30 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
KEPCO. Dual utility feeds.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Seoul, Seoul, South Korea

Seoul metro (asia-northeast3)

37.540°, 127.000° · Asia

Tenants / users

Google Cloud

Notes

Google's Korea cloud region (asia-northeast3).

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.