Google Cloud São Paulo
Google · southamerica-east1
- IT live
- 60 MW
- Remaining
- 30 MW
- $ / kW·mo
- $88
- White space
- 469k ft²
Inventory
67% occupiedPower
90 MWcampus
30 MW to commission · 60 MW in use
White space
703k ft²total
234k ft² free · 469k ft² occupied
65k m² · 22k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 52.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$88/kW·mo
10.8¢ industrial · 12.1¢ after PUE 1.12
- Per MW·year
- $1.1M
- This site · 60 MW
- $64M/yr
- 20 kW rack
- $1,766/mo
3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $45M/yr less.
Enel SP · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2017
- Renewable match
- 80%
- Rack density
- 20 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Enel SP / CPFL. Dual feeds plus on-site diesel. Hydro-heavy Brazilian grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
0.28 L/kWh
fleet avg · 2025 · 147k m³/yr at 60 MW
Operator fleet average applied to this hall — not a site meter. Google environmental report.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
São Paulo, São Paulo, Brazil
Greater São Paulo (AZ undisclosed)
-23.520°, -46.660° · South America
Tenants / users
Google Cloud
Notes
southamerica-east1. Third hyperscaler region in Brazil after AWS sa-east-1 (2011) and Azure Brazil South. Hydro PPAs. Completes the SP cloud triangle.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.