Google Pryor North
Google · Mayes County
- IT live
- 400 MW
- Remaining
- 120 MW
- $ / kW·mo
- $51
- White space
- 800k ft²
Inventory
77% occupiedPower
520 MWcampus
120 MW to commission · 400 MW in use
White space
1M ft²total
240k ft² free · 800k ft² occupied
97k m² · 22k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 120 MW of the utility feed is cooling, conversion, and house load.
Power cost
$51/kW·mo
6.4¢ industrial · 7¢ after PUE 1.10
- Per MW·year
- $617k
- This site · 400 MW
- $247M/yr
- 60 kW rack
- $3,084/mo
2.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $123M/yr less.
Oklahoma industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2023
- Renewable match
- 80%
- Rack density
- 60 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- Public Service Company of Oklahoma plus Google PPAs.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
60 kW
H100-eq
637k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
TPU liquid loops in AI halls; evaporative cooling for CPU halls.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Pryor, Oklahoma, United States
MidAmerica Industrial Park, Pryor, OK
36.230°, -95.317° · North America
Tenants / users
Notes
Among Google's largest compute sites by H100-equivalent in 2026.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.