Planned
Hyperscale
Air cooled

Google Palo

Google · Linn County

Planned IT
—
Remaining
—
$ / kW·mo
$58
White space
—

Power

IT live—
Remaining—
Utility feed—
Campus / planned—

Power cost

$58/kW·mo

6.1¢ industrial · 7.9¢ after PUE —

Per MW·year
$695k
This site
—
3.2¢ cheapdear 22.4¢

1.9× the cheapest market (Iceland Landsvirkjun).

MidAmerican · utility tariff × PUE, not colo list price.

Redundancy
—
Opened
—
Renewable match
—
Rack density
—
Voltage
—
PUE
—1.00 ideal · 1.60 typical
Power source
—

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

—

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cooling design not published by the operator for this site; typed air as the neutral default.

Network carriers

0

No on-net carriers published.

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

0

No public-cloud on-ramp published.

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Palo, Iowa, United States

42.066°, -91.796° · North America

Tenants / users

Google

Notes

Google plans six buildings near the Duane Arnold nuclear plant (planned restart); groundbreaking targeted for early 2027, full build by 2031; 10 to 14M gallons of water a day (Google at Linn County public meeting, Oct 22 2026). Coordinates: Palo town center (approximate). Source: https://www.kcrg.com/2026/10/23/google-gives-insight-into-palo-data-center-project-plans-break-ground/

Operator site