Operational
Hyperscale
Liquid cooling
Tier III

Google Cloud Osaka

Google · Osaka

IT live
25 MW
Remaining
15 MW
$ / kW·mo
$135
White space
89k ft²

Inventory

63% occupied

Power

40 MWcampus

15 MW to commission · 25 MW in use

White space

143k ft²total

54k ft² free · 89k ft² occupied

13k m² · 4,977 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live25 MW
Remaining15 MW
Utility feed50 MW
Campus / planned40 MW

About 25 MW of the utility feed is cooling, conversion, and house load.

Power cost

$135/kW·mo

16.2¢ industrial · 18.5¢ after PUE 1.14

Per MW·year
$1.6M
This site · 25 MW
$40M/yr
25 kW rack
$3,370/mo
3.2¢ cheapdear 22.4¢

5.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $32M/yr less.

Kansai Electric · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2019
Renewable match
85%
Rack density
25 kW
PUE
1.141.00 ideal · 1.60 typical
Power source
Kansai Electric (KEPCO). Dual feeds. Seismically isolated building.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Osaka, Osaka, Japan

Osaka metro

34.710°, 135.530° · Asia

Tenants / users

Google Cloud

Notes

asia-northeast2. Google's Osaka region — DR and in-country dual-region for Tokyo.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.