Operational
Hyperscale
Liquid cooling
Tier III

Google New Albany

Google · New Albany Campus

IT live
453 MW
Remaining
147 MW
$ / kW·mo
$54
White space
906k ft²

Inventory

76% occupied

Power

600 MWcampus

147 MW to commission · 453 MW in use

White space

1.2M ft²total

294k ft² free · 906k ft² occupied

111k m² · 27k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live453 MW
Remaining147 MW
Utility feed600 MW
Campus / planned600 MW

About 147 MW of the utility feed is cooling, conversion, and house load.

Power cost

$54/kW·mo

6.7¢ industrial · 7.4¢ after PUE 1.10

Per MW·year
$646k
This site · 453 MW
$292M/yr
80 kW rack
$4,304/mo
3.2¢ cheapdear 22.4¢

2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $153M/yr less.

AEP Ohio · utility tariff × PUE, not colo list price.

Redundancy
N+2
Opened
2024
Renewable match
90%
Rack density
80 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
AEP Ohio plus Google PPAs.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

80 kW

H100-eq

551k

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

In-row CDUs feeding TPU pods. Google has deployed about 1 GW of liquid cooling across ~2,000 TPU pods at 99.999% cooling uptime.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

New Albany, Ohio, United States

New Albany, OH

40.073°, -82.821° · North America

Tenants / users

Google

Notes

Ironwood / TPU v6 pods. Sits in the same Ohio metro as Meta Prometheus.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.