Google New Albany
Google · New Albany Campus
- IT live
- 453 MW
- Remaining
- 147 MW
- $ / kW·mo
- $54
- White space
- 906k ft²
Inventory
76% occupiedPower
600 MWcampus
147 MW to commission · 453 MW in use
White space
1.2M ft²total
294k ft² free · 906k ft² occupied
111k m² · 27k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 147 MW of the utility feed is cooling, conversion, and house load.
Power cost
$54/kW·mo
6.7¢ industrial · 7.4¢ after PUE 1.10
- Per MW·year
- $646k
- This site · 453 MW
- $292M/yr
- 80 kW rack
- $4,304/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $153M/yr less.
AEP Ohio · utility tariff × PUE, not colo list price.
- Redundancy
- N+2
- Opened
- 2024
- Renewable match
- 90%
- Rack density
- 80 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- AEP Ohio plus Google PPAs.
Cooling
Plant
Direct-to-chip
Liquid
Deployed
Rack density
80 kW
H100-eq
551k
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
In-row CDUs feeding TPU pods. Google has deployed about 1 GW of liquid cooling across ~2,000 TPU pods at 99.999% cooling uptime.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
New Albany, Ohio, United States
New Albany, OH
40.073°, -82.821° · North America
Tenants / users
Notes
Ironwood / TPU v6 pods. Sits in the same Ohio metro as Meta Prometheus.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.