Expanding
Hyperscale
Liquid cooling
Tier III

Google Cloud Montréal

Google · northamerica-northeast1

IT live
48 MW
Remaining
32 MW
$ / kW·mo
$40
White space
357k ft²

Inventory

60% occupied

Power

80 MWcampus

32 MW to commission · 48 MW in use

White space

595k ft²total

238k ft² free · 357k ft² occupied

55k m² · 22k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live48 MW
Remaining32 MW
Utility feed100 MW
Campus / planned80 MW

About 52 MW of the utility feed is cooling, conversion, and house load.

Power cost

$40/kW·mo

5¢ industrial · 5.5¢ after PUE 1.10

Per MW·year
$482k
This site · 48 MW
$23M/yr
25 kW rack
$1,004/mo
3.2¢ cheapdear 22.4¢

1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $8.3M/yr less.

Hydro-Québec Rate L · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2018
Renewable match
99%
Rack density
25 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
Hydro-Québec. Dual MV inlets plus on-site diesel. ~99.8 percent hydro (Rate L on large sites).

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Montréal, Quebec, Canada

Greater Montréal (AZ undisclosed)

45.500°, -73.700° · North America

Tenants / users

Google Cloud

Notes

northamerica-northeast1. First Google Canadian region. Hydro-Québec CFE matching. Dual-site with Toronto northamerica-northeast2.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.