Expanding
Hyperscale
Liquid cooling
Tier III

Google Cloud Milan

Google · europe-west8

IT live
36 MW
Remaining
24 MW
$ / kW·mo
$152
White space
268k ft²

Inventory

60% occupied

Power

60 MWcampus

24 MW to commission · 36 MW in use

White space

446k ft²total

179k ft² free · 268k ft² occupied

41k m² · 17k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live36 MW
Remaining24 MW
Utility feed75 MW
Campus / planned60 MW

About 39 MW of the utility feed is cooling, conversion, and house load.

Power cost

$152/kW·mo

18.6¢ industrial · 20.8¢ after PUE 1.12

Per MW·year
$1.8M
This site · 36 MW
$66M/yr
25 kW rack
$3,802/mo
3.2¢ cheapdear 22.4¢

5.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $54M/yr less.

Italy industrial / Milan · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2022
Renewable match
70%
Rack density
25 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
Terna / Enel. Dual MV inlets plus on-site diesel. Gas-marginal Italian grid.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Milan, Lombardy, Italy

Greater Milan (AZ undisclosed)

45.458°, 9.185° · Europe

Tenants / users

Google Cloud

Notes

europe-west8. Completes the Milan cloud triangle with AWS eu-south-1 and Azure Italy North already in the index. Dual-site with Turin europe-west12.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.