Google Middenmeer
Google · Agriport A7
- IT live
- 60 MW
- Remaining
- 30 MW
- $ / kW·mo
- $106
- White space
- 402k ft²
Inventory
67% occupiedPower
90 MWcampus
30 MW to commission · 60 MW in use
White space
603k ft²total
201k ft² free · 402k ft² occupied
56k m² · 19k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 52.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$106/kW·mo
13.2¢ industrial · 14.5¢ after PUE 1.10
- Per MW·year
- $1.3M
- This site · 60 MW
- $76M/yr
- 25 kW rack
- $2,650/mo
4.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $58M/yr less.
Agriport / TenneT 380 kV · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2020
- Renewable match
- 80%
- Rack density
- 25 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- TenneT 380 kV Agriport / Eemshaven. Dual 380 kV plus on-site diesel. North Sea wind overlay. One of two Dutch hyperscale zones still permitted after the 2022 moratorium.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
10On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Middenmeer, North Holland, Netherlands
Agriport A7, Middenmeer, Hollands Kroon
52.801°, 5.012° · Europe
Tenants / users
Google Cloud europe-west4
Notes
Second Dutch Google campus after Eemshaven. Opened 2020 on Agriport next to Microsoft. 80 percent CFE matching 2024. Complements Eemshaven (already in the index) and Winschoten.