Expanding
Hyperscale
Liquid cooling
Tier III

Google Cloud Mexico

Google Cloud · mexico-northeast1

IT live
32 MW
Remaining
40 MW
$ / kW·mo
$89
White space
321k ft²

Inventory

44% occupied

Power

72 MWcampus

40 MW to commission · 32 MW in use

White space

723k ft²total

402k ft² free · 321k ft² occupied

67k m² · 37k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live32 MW
Remaining40 MW
Utility feed90 MW
Campus / planned72 MW

About 58 MW of the utility feed is cooling, conversion, and house load.

Power cost

$89/kW·mo

9.8¢ industrial · 12.3¢ after PUE 1.25

Per MW·year
$1.1M
This site · 32 MW
$34M/yr
25 kW rack
$2,236/mo
3.2¢ cheapdear 22.4¢

3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $23M/yr less.

CFE Queretaro · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2024
Renewable match
50%
Rack density
25 kW
PUE
1.251.00 ideal · 1.60 typical
Power source
CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Queretaro, Queretaro, Mexico

Queretaro

20.594°, -100.395° · North America

Tenants / users

Google Cloud

Notes

Google Cloud region opened Dec 2024. Third LatAm region after Sao Paulo and Santiago. Not a colo hall. CFE interconnection is the constraint.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.