Google Cloud Mexico
Google Cloud · mexico-northeast1
- IT live
- 32 MW
- Remaining
- 40 MW
- $ / kW·mo
- $89
- White space
- 321k ft²
Inventory
44% occupiedPower
72 MWcampus
40 MW to commission · 32 MW in use
White space
723k ft²total
402k ft² free · 321k ft² occupied
67k m² · 37k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 58 MW of the utility feed is cooling, conversion, and house load.
Power cost
$89/kW·mo
9.8¢ industrial · 12.3¢ after PUE 1.25
- Per MW·year
- $1.1M
- This site · 32 MW
- $34M/yr
- 25 kW rack
- $2,236/mo
3.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $23M/yr less.
CFE Queretaro · utility tariff × PUE, not colo list price.
- Redundancy
- 2N
- Opened
- 2024
- Renewable match
- 50%
- Rack density
- 25 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- CFE. Dual 23 kV or 115 kV inlets plus on-site diesel. Mexican federal grid; interconnection queues are the constraint.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Queretaro, Queretaro, Mexico
Queretaro
20.594°, -100.395° · North America
Tenants / users
Google Cloud
Notes
Google Cloud region opened Dec 2024. Third LatAm region after Sao Paulo and Santiago. Not a colo hall. CFE interconnection is the constraint.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.