Google Lancaster
- Planned IT
- —
- Remaining
- —
- $ / kW·mo
- $64
- White space
- —
Power
Power cost
$64/kW·mo
6.7¢ industrial · 8.7¢ after PUE —
- Per MW·year
- $763k
- This site
- —
2.1× the cheapest market (Iceland Landsvirkjun).
AEP Ohio · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Lancaster, Ohio, United States
39.714°, -82.599° · North America
Tenants / users
Notes
Listed as an operating location (Lancaster, Ohio) on Google's official data center locations page. Capacity, investment and opening year not published there. Coordinates: OSM relation 182887 (town center, approximate). Source: https://datacenters.google/locations/
Compiled from public filings, operator pages, and reporting. Not an official operator specification.