Operational
Hyperscale
Liquid cooling
Tier III

Google Cloud Johannesburg

Google · Johannesburg

IT live
30 MW
Remaining
20 MW
$ / kW·mo
$77
White space
107k ft²

Inventory

60% occupied

Power

50 MWcampus

20 MW to commission · 30 MW in use

White space

179k ft²total

71k ft² free · 107k ft² occupied

17k m² · 6,636 m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live30 MW
Remaining20 MW
Utility feed62.5 MW
Campus / planned50 MW

About 32.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$77/kW·mo

9.4¢ industrial · 10.5¢ after PUE 1.12

Per MW·year
$922k
This site · 30 MW
$28M/yr
25 kW rack
$1,921/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $18M/yr less.

Eskom Gauteng · utility tariff × PUE, not colo list price.

Redundancy
N+2
Opened
2024
Renewable match
70%
Rack density
25 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
Eskom plus on-site diesel and solar. Extended runtime sized for load-shedding ride-through.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

TPU liquid loops in AI halls; evaporative/air on CPU.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Johannesburg, Gauteng, South Africa

Johannesburg metro (africa-south1)

-26.100°, 28.050° · Africa

Tenants / users

Google Cloud

Notes

Google's first African cloud region (africa-south1).

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.