Operational
Hyperscale
Liquid cooling
Tier III

Google Cloud Jakarta

Google · Jakarta

IT live
28 MW
Remaining
20 MW
$ / kW·mo
$75
White space
214k ft²

Inventory

58% occupied

Power

48 MWcampus

20 MW to commission · 28 MW in use

White space

367k ft²total

153k ft² free · 214k ft² occupied

34k m² · 14k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live28 MW
Remaining20 MW
Utility feed60 MW
Campus / planned48 MW

About 32 MW of the utility feed is cooling, conversion, and house load.

Power cost

$75/kW·mo

9.2¢ industrial · 10.3¢ after PUE 1.12

Per MW·year
$903k
This site · 28 MW
$25M/yr
25 kW rack
$1,880/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $16M/yr less.

PLN · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2020
Renewable match
20%
Rack density
25 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
PLN. Dual municipal feeds plus on-site generators.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Jakarta, Jakarta, Indonesia

Jakarta metro (asia-southeast2)

-6.205°, 106.855° · Asia

Tenants / users

Google Cloud

Notes

asia-southeast2. Google's second Southeast Asia region after Singapore.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.