Operational
Hyperscale
Liquid cooling
Tier III

Google Hamina

Google · Hamina

Google Hamina facility
Wikimedia Commons · Source
IT live
150 MW
Remaining
50 MW
$ / kW·mo
$46
White space
625k ft²

Inventory

75% occupied

Power

200 MWcampus

50 MW to commission · 150 MW in use

White space

833k ft²total

208k ft² free · 625k ft² occupied

77k m² · 19k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live150 MW
Remaining50 MW
Utility feed200 MW
Campus / planned200 MW

About 50 MW of the utility feed is cooling, conversion, and house load.

Power cost

$46/kW·mo

5.8¢ industrial · 6.3¢ after PUE 1.09

Per MW·year
$554k
This site · 150 MW
$83M/yr
20 kW rack
$923/mo
3.2¢ cheapdear 22.4¢

1.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $37M/yr less.

Finland Hamina · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2011
Renewable match
100%
Rack density
20 kW
PUE
1.091.00 ideal · 1.60 typical
Power source
Finnish grid plus wind PPAs. Seawater from the Baltic for heat rejection.

Cooling

Plant

Seawater

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Seawater heat exchange from the Baltic Sea. Among Google's lowest water-use sites. Not chip-level liquid; facility-scale liquid heat rejection.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Hamina, Kymenlaakso, Finland

Former Stora Enso paper mill, Hamina

60.569°, 27.198° · Europe

Tenants / users

Google

Notes

Converted paper mill on the Finnish coast. A reference site for seawater cooling.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.