Google Groningen Westpoort
Google · Westpoort Hoogkerk
- Planned IT
- 48 MW
- Remaining
- 48 MW
- $ / kW·mo
- $120
- White space
- 171k ft²
Inventory
0% occupiedPower
48 MWcampus
48 MW pipeline · 0 MW in use
White space
171k ft²total
171k ft² free · — occupied
16k m² · 16k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
Power cost
$120/kW·mo
12.8¢ industrial · 16.4¢ after PUE 1.28
- Per MW·year
- $1.4M
- This site · 48 MW
- $69M/yr
- 25 kW rack
- $2,990/mo
4.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $52M/yr less.
Groningen / TenneT · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 85%
- Rack density
- 25 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- TenneT 380 kV Eemshaven energy port. Dual 380 kV plus on-site diesel. North Sea wind interconnectors and subsea cables.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
25 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
10On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Groningen, Groningen, Netherlands
Westpoort industrial estate, west of Hoogkerk
53.198°, 6.501° · Europe
Tenants / users
Google Cloud europe-west4
Notes
Fourth Dutch Google campus. Ground broken April 2024 on land west of Hoogkerk. Completes a four-site Dutch Google set with Eemshaven, Middenmeer and Winschoten.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.