Under construction
Hyperscale
Liquid cooling
Tier III

Google Groningen Westpoort

Google · Westpoort Hoogkerk

Planned IT
48 MW
Remaining
48 MW
$ / kW·mo
$120
White space
171k ft²

Inventory

0% occupied

Power

48 MWcampus

48 MW pipeline · 0 MW in use

White space

171k ft²total

171k ft² free · — occupied

16k m² · 16k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live—
Remaining48 MW
Utility feed—
Campus / planned48 MW

Power cost

$120/kW·mo

12.8¢ industrial · 16.4¢ after PUE 1.28

Per MW·year
$1.4M
This site · 48 MW
$69M/yr
25 kW rack
$2,990/mo
3.2¢ cheapdear 22.4¢

4.0× the cheapest market (Iceland Landsvirkjun). Same IT load there is $52M/yr less.

Groningen / TenneT · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
85%
Rack density
25 kW
PUE
1.281.00 ideal · 1.60 typical
Power source
TenneT 380 kV Eemshaven energy port. Dual 380 kV plus on-site diesel. North Sea wind interconnectors and subsea cables.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

10

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Groningen, Groningen, Netherlands

Westpoort industrial estate, west of Hoogkerk

53.198°, 6.501° · Europe

Tenants / users

Google Cloud europe-west4

Notes

Fourth Dutch Google campus. Ground broken April 2024 on land west of Hoogkerk. Completes a four-site Dutch Google set with Eemshaven, Middenmeer and Winschoten.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.