Expanding
Hyperscale
Liquid cooling
Tier III

Google Fredericia Taulov

Google · Taulov

Google Fredericia Taulov facility
Google · Source
IT live
120 MW
Remaining
80 MW
$ / kW·mo
$90
White space
893k ft²

Inventory

60% occupied

Power

200 MWcampus

80 MW to commission · 120 MW in use

White space

1.5M ft²total

595k ft² free · 893k ft² occupied

138k m² · 55k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live120 MW
Remaining80 MW
Utility feed250 MW
Campus / planned200 MW

About 130 MW of the utility feed is cooling, conversion, and house load.

Power cost

$90/kW·mo

11.2¢ industrial · 12.3¢ after PUE 1.10

Per MW·year
$1.1M
This site · 120 MW
$130M/yr
25 kW rack
$2,248/mo
3.2¢ cheapdear 22.4¢

3.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $93M/yr less.

Denmark DK1 · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2022
Renewable match
100%
Rack density
25 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
Energinet. Dual feeds. Wind-heavy Danish grid plus Viking Link.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Fredericia, South Denmark, Denmark

Taulov, Fredericia

55.546°, 9.618° · Europe

Tenants / users

Google

Notes

Google's Denmark campus. 200 MW class. Wind-matched. Completes the Danish hyperscale set with Apple Viborg and Meta Odense.