Operational
Hyperscale
Liquid cooling
Tier III

Google Council Bluffs

Google · Council Bluffs

Google Council Bluffs facility
Wikimedia Commons · Source
IT live
200 MW
Remaining
60 MW
$ / kW·mo
$49
White space
714k ft²

Inventory

77% occupied

Power

260 MWcampus

60 MW to commission · 200 MW in use

White space

929k ft²total

214k ft² free · 714k ft² occupied

86k m² · 20k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live200 MW
Remaining60 MW
Utility feed260 MW
Campus / planned260 MW

About 60 MW of the utility feed is cooling, conversion, and house load.

Power cost

$49/kW·mo

6.1¢ industrial · 6.8¢ after PUE 1.11

Per MW·year
$593k
This site · 200 MW
$119M/yr
25 kW rack
$1,236/mo
3.2¢ cheapdear 22.4¢

1.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $56M/yr less.

MidAmerican · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2007
Renewable match
90%
Rack density
25 kW
PUE
1.111.00 ideal · 1.60 typical
Power source
MidAmerican wind.

Cooling

Plant

Evaporative

Liquid

Deployed

Rack density

25 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

One of Google's largest US campuses. TPU liquid cooling in newer halls; evaporative on older buildings.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Council Bluffs, Iowa, United States

Council Bluffs, IA

41.262°, -95.861° · North America

Tenants / users

Google

Notes

Iowa wind plus a long-running Google campus on the Missouri River.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.