Google Changhua
Google · Changhua

- IT live
- 80 MW
- Remaining
- 40 MW
- $ / kW·mo
- $75
- White space
- 250k ft²
Inventory
67% occupiedPower
120 MWcampus
40 MW to commission · 80 MW in use
White space
375k ft²total
125k ft² free · 250k ft² occupied
35k m² · 12k m² free
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 70 MW of the utility feed is cooling, conversion, and house load.
Power cost
$75/kW·mo
9.2¢ industrial · 10.3¢ after PUE 1.12
- Per MW·year
- $903k
- This site · 80 MW
- $72M/yr
- 30 kW rack
- $2,257/mo
2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $47M/yr less.
Taipower · utility tariff × PUE, not colo list price.
- Redundancy
- N+2
- Opened
- 2013
- Renewable match
- 25%
- Rack density
- 30 kW
- PUE
- 1.121.00 ideal · 1.60 typical
- Power source
- Taipower. Dual feeds. Seismic design.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
30 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
TPU liquid loops in AI halls; seawater/air economization on CPU. One of Google's largest APAC campuses.
Network carriers
5On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Changhua, Changhua, Taiwan
Changhua County, Taiwan
24.080°, 120.540° · Asia
Tenants / users
Google, Google Cloud
Notes
Google's first Asian self-build DC. Changhua coastal campus, expanded through the 2020s.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.