Operational
Hyperscale
Liquid cooling
Tier III

Google Changhua

Google · Changhua

Google Changhua facility
Google · Source
IT live
80 MW
Remaining
40 MW
$ / kW·mo
$75
White space
250k ft²

Inventory

67% occupied

Power

120 MWcampus

40 MW to commission · 80 MW in use

White space

375k ft²total

125k ft² free · 250k ft² occupied

35k m² · 12k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live80 MW
Remaining40 MW
Utility feed150 MW
Campus / planned120 MW

About 70 MW of the utility feed is cooling, conversion, and house load.

Power cost

$75/kW·mo

9.2¢ industrial · 10.3¢ after PUE 1.12

Per MW·year
$903k
This site · 80 MW
$72M/yr
30 kW rack
$2,257/mo
3.2¢ cheapdear 22.4¢

2.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $47M/yr less.

Taipower · utility tariff × PUE, not colo list price.

Redundancy
N+2
Opened
2013
Renewable match
25%
Rack density
30 kW
PUE
1.121.00 ideal · 1.60 typical
Power source
Taipower. Dual feeds. Seismic design.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

30 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

TPU liquid loops in AI halls; seawater/air economization on CPU. One of Google's largest APAC campuses.

Network carriers

5

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Changhua, Changhua, Taiwan

Changhua County, Taiwan

24.080°, 120.540° · Asia

Tenants / users

Google, Google Cloud

Notes

Google's first Asian self-build DC. Changhua coastal campus, expanded through the 2020s.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.