Google Cedar Rapids
- Planned IT
- —
- Remaining
- —
- $ / kW·mo
- $59
- White space
- —
Power
Power cost
$59/kW·mo
6.2¢ industrial · 8.1¢ after PUE —
- Per MW·year
- $706k
- This site
- —
1.9× the cheapest market (Iceland Landsvirkjun).
MidAmerican / MISO · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- —
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Cedar Rapids, Iowa, United States
41.976°, -91.670° · North America
Tenants / users
Notes
Listed as in development (Cedar Rapids, Iowa) on Google's official data center locations page; typed planned because Google gives no construction stage. Capacity, investment and timing not published there. Coordinates: OSM relation 129088 (town center, approximate). Source: https://datacenters.google/locations/
Compiled from public filings, operator pages, and reporting. Not an official operator specification.