Google Cloud Argentina
Google · Buenos Aires
- IT live
- 40 MW
- Remaining
- 0 MW
- $ / kW·mo
- $74
- White space
- 167k ft²
Inventory
100% occupiedPower
40 MWcampus
0 MW to commission · 40 MW in use
White space
167k ft²total
— free · 167k ft² occupied
15k m²
Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.
Power
About 10 MW of the utility feed is cooling, conversion, and house load.
Power cost
$74/kW·mo
8.6¢ industrial · 10.1¢ after PUE 1.18
- Per MW·year
- $889k
- This site · 40 MW
- $36M/yr
- 20 kW rack
- $1,482/mo
2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $22M/yr less.
Argentina industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2024
- Renewable match
- 60%
- Rack density
- 20 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Argentine grid. Renewable matching in progress.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Google Cloud Argentina region.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
1Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Buenos Aires, Buenos Aires, Argentina
Buenos Aires Province, Argentina
-34.603°, -58.381° · South America
Tenants / users
Google Cloud
Notes
Google's Buenos Aires region, ~40 MW. Argentina otherwise has a thin colo market.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.