Operational
Hyperscale
Liquid cooling
Tier III

Google Cloud Argentina

Google · Buenos Aires

IT live
40 MW
Remaining
0 MW
$ / kW·mo
$74
White space
167k ft²

Inventory

100% occupied

Power

40 MWcampus

0 MW to commission · 40 MW in use

White space

167k ft²total

free · 167k ft² occupied

15k m²

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live40 MW
Remaining0 MW
Utility feed50 MW
Campus / planned40 MW

About 10 MW of the utility feed is cooling, conversion, and house load.

Power cost

$74/kW·mo

8.6¢ industrial · 10.1¢ after PUE 1.18

Per MW·year
$889k
This site · 40 MW
$36M/yr
20 kW rack
$1,482/mo
3.2¢ cheapdear 22.4¢

2.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $22M/yr less.

Argentina industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2024
Renewable match
60%
Rack density
20 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Argentine grid. Renewable matching in progress.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Google Cloud Argentina region.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

1

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Buenos Aires, Buenos Aires, Argentina

Buenos Aires Province, Argentina

-34.603°, -58.381° · South America

Tenants / users

Google Cloud

Notes

Google's Buenos Aires region, ~40 MW. Argentina otherwise has a thin colo market.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.