Operational
Colocation
Liquid cooling
Tier III

Global Switch Paris West

Global Switch · Clichy-Levallois

IT live
17 MW
Free to lease
1.9 MW
$ / kW·mo
$97
White space
133k ft²

Inventory

89% occupied

Power

17 MWlive

1.9 MW to lease · 15.1 MW in use

White space

133k ft²total

12k ft² free · 121k ft² occupied

12k m² · 1,086 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live17 MW
Free to lease1.9 MW
Utility feed21.3 MW
Campus / planned17 MW

About 4.3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$97/kW·mo

10.4¢ industrial · 13.3¢ after PUE 1.28

Per MW·year
$1.2M
This site · 17 MW
$20M/yr
10 kW rack
$972/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $14M/yr less.

France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2008
Renewable match
90%
Rack density
10 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

10 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Clichy, Île-de-France, France

7-9 rue Petit, 92582 Clichy

48.904°, 2.296° · Europe

Tenants / users

Cloud, enterprise, networks

Notes

West wing of the Clichy campus. Same dual utility as East / North / South.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.