Operational
Colocation
Liquid cooling
Tier III

Global Switch Paris South

Global Switch · Clichy-Levallois

IT live
18 MW
Free to lease
2.0 MW
$ / kW·mo
$97
White space
141k ft²

Inventory

89% occupied

Power

18 MWlive

2.0 MW to lease · 16.0 MW in use

White space

141k ft²total

12k ft² free · 128k ft² occupied

13k m² · 1,150 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live18 MW
Free to lease2.0 MW
Utility feed22.5 MW
Campus / planned18 MW

About 4.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$97/kW·mo

10.4¢ industrial · 13.3¢ after PUE 1.28

Per MW·year
$1.2M
This site · 18 MW
$21M/yr
10 kW rack
$972/mo
3.2¢ cheapdear 22.4¢

3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.

France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2016
Renewable match
90%
Rack density
10 kW
Voltage
PUE
1.281.00 ideal · 1.60 typical
Power source
RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

10 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Clichy, Île-de-France, France

7-9 rue Petit, 92582 Clichy

48.903°, 2.298° · Europe

Tenants / users

Cloud, enterprise, wholesale

Notes

South wing. Completes the 81 MW Clichy campus.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.