Global Switch Paris North
Global Switch · Clichy-Levallois
- IT live
- 24 MW
- Free to lease
- 2.6 MW
- $ / kW·mo
- $97
- White space
- 170k ft²
Inventory
89% occupiedPower
24 MWlive
2.6 MW to lease · 21.4 MW in use
White space
170k ft²total
15k ft² free · 155k ft² occupied
16k m² · 1,394 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 6 MW of the utility feed is cooling, conversion, and house load.
Power cost
$97/kW·mo
10.4¢ industrial · 13.3¢ after PUE 1.28
- Per MW·year
- $1.2M
- This site · 24 MW
- $28M/yr
- 12 kW rack
- $1,166/mo
3.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $19M/yr less.
France Enedis / Ile-de-France · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2014
- Renewable match
- 90%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- RTE / Enedis. Dual MV inlets plus on-site diesel. Nuclear-heavy French grid (ARENH).
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Clichy, Île-de-France, France
7-9 rue Petit, 92582 Clichy
48.905°, 2.298° · Europe
Tenants / users
Hyperscale, cloud, HPC
Notes
Largest Clichy wing by nameplate. AI / HPC liquid cabinets.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.