Global Switch Amsterdam West
Global Switch · Johan Huizingalaan
- IT live
- 28 MW
- Free to lease
- 2.5 MW
- $ / kW·mo
- $142
- White space
- 219k ft²
Inventory
91% occupiedPower
28 MWlive
2.5 MW to lease · 25.5 MW in use
White space
219k ft²total
16k ft² free · 203k ft² occupied
20k m² · 1,463 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 7 MW of the utility feed is cooling, conversion, and house load.
Power cost
$142/kW·mo
15.6¢ industrial · 19.5¢ after PUE 1.25
- Per MW·year
- $1.7M
- This site · 28 MW
- $48M/yr
- 10 kW rack
- $1,424/mo
4.9× the cheapest market (Iceland Landsvirkjun). Same IT load there is $38M/yr less.
Amsterdam metro / Liander 50 kV · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 1999
- Renewable match
- 100%
- Rack density
- 10 kW
- PUE
- 1.251.00 ideal · 1.60 typical
- Power source
- TenneT / Liander. Dual MV inlets plus on-site diesel. Dutch wind-plus-gas mix; DDA halls buy 100 percent certified green power.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
11On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
5Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Amsterdam, North Holland, Netherlands
Johan Huizingalaan 759, 1066 VH Amsterdam
52.351°, 4.829° · Europe
Tenants / users
Hyperscale, cloud, finance, 100-plus carriers — AMS-IX and NL-ix
Notes
Original Amsterdam West hall. 40,000 sqm campus, 60 MVA / 50 kV. Carrier-dense Slotervaart campus. Pair to Amsterdam East on the same freehold.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.