Expanding
Colocation
Air cooled
Tier III

GigaCenter Kyiv

GigaCenter · Kyiv

IT live
4 MW
Free to lease
0.6 MW
$ / kW·mo
$146
White space
59k ft²

Inventory

86% occupied

Power

4 MWlive

0.6 MW to lease · 3.4 MW in use

White space

59k ft²total

4,375 ft² free · 54k ft² occupied

5,444 m² · 406 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live4 MW
Free to lease0.6 MW
Utility feed7.5 MW
Campus / planned6 MW

About 3.5 MW of the utility feed is cooling, conversion, and house load.

Power cost

$146/kW·mo

15.2¢ industrial · 20.1¢ after PUE 1.32

Per MW·year
$1.8M
This site · 4 MW
$7M/yr
6 kW rack
$879/mo
3.2¢ cheapdear 22.4¢

4.7× the cheapest market (Iceland Landsvirkjun). Same IT load there is $5.6M/yr less.

Ukrenergo wartime · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2012
Renewable match
20%
Rack density
6 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
Ukrenergo. Dual 10 kV plus on-site diesel. Wartime islanding and generator-backed halls.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

6 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Chilled-water CRAH, N+1. Isolated hot aisles. Not an AI factory unless noted.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Kyiv, Kyiv, Ukraine

Kyiv

50.454°, 30.518° · Europe

Tenants / users

Networks, enterprise, UA-IX

Notes

Kyiv carrier-neutral hall. UA-IX adjacency. Complements De Novo for metro diversity under wartime constraints.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.