Under construction
Hyperscale
Liquid cooling
Tier III

G42 Stargate Abu Dhabi

G42 / OpenAI / Microsoft / MGX · Stargate UAE

Planned IT
5 GW
Remaining
5 GW
$ / kW·mo
$65
White space
10M ft²

Inventory

0% occupied

Power

5 GWcampus

5 GW pipeline · 0 MW in use

White space

10M ft²total

10M ft² free · occupied

929k m² · 929k m² free

Remaining power is campus IT not yet commissioned — captive capacity, not third-party colo.

Power

IT live
Remaining5 GW
Utility feed
Campus / planned5 GW

Power cost

$65/kW·mo

7.4¢ industrial · 8.9¢ after PUE 1.20

Per MW·year
$778k
This site · 5 GW
$3.9B/yr
120 kW rack
$7,779/mo
3.2¢ cheapdear 22.4¢

2.3× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.2B/yr less.

TAQA / EWEC · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2027
Renewable match
70%
Rack density
120 kW
PUE
1.201.00 ideal · 1.60 typical
Power source
TAQA, Barakah nuclear, and solar.

Cooling

Plant

Direct-to-chip

Liquid

Deployed

Rack density

120 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

UAE–US AI campus targeting 5 GW. Liquid-cooled AI factories in a desert climate, relying on chip-level loops rather than evaporative towers.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

3

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Abu Dhabi, Abu Dhabi, United Arab Emirates

Abu Dhabi, UAE

24.453°, 54.377° · Asia

Tenants / users

G42, OpenAI, Microsoft

Notes

Among the largest announced AI campuses globally. Nuclear plus solar is the power thesis.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.