Planned
Colocation
Liquid cooling
Tier III

EyrieDC Bakki

EyrieDC / Akur DC · Bakki

Planned IT
120 MW
Free to lease
120 MW
$ / kW·mo
$26
White space
240k ft²

Inventory

0% occupied

Power

120 MWlive

120 MW to lease · 0 MW in use

White space

240k ft²total

240k ft² free · occupied

22k m² · 22k m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease120 MW
Utility feed
Campus / planned120 MW

Power cost

$26/kW·mo

3.2¢ industrial · 3.5¢ after PUE 1.10

Per MW·year
$308k
This site · 120 MW
$37M/yr
60 kW rack
$1,542/mo
3.2¢ cheapdear 22.4¢

cheapest in the index (Iceland Landsvirkjun).

Iceland Landsvirkjun · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2028
Renewable match
100%
Rack density
60 kW
PUE
1.101.00 ideal · 1.60 typical
Power source
Landsvirkjun. Reuses industrial interconnection built for Bakki.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

60 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Four 30 MW stages. Liquid-ready HPC. Zoning still under review.

Network carriers

4

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

2

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Húsavík, Northeastern, Iceland

Bakki industrial area, near Húsavík

66.044°, -17.338° · Europe

Tenants / users

US cloud / AI customer (undisclosed)

Notes

ISK 120bn plan for 100–120 MW. Construction eyed 2027. Developer-stated customer and timetable; treat as pipeline.