EyrieDC Bakki
EyrieDC / Akur DC · Bakki
- Planned IT
- 120 MW
- Free to lease
- 120 MW
- $ / kW·mo
- $26
- White space
- 240k ft²
Inventory
0% occupiedPower
120 MWlive
120 MW to lease · 0 MW in use
White space
240k ft²total
240k ft² free · — occupied
22k m² · 22k m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$26/kW·mo
3.2¢ industrial · 3.5¢ after PUE 1.10
- Per MW·year
- $308k
- This site · 120 MW
- $37M/yr
- 60 kW rack
- $1,542/mo
cheapest in the index (Iceland Landsvirkjun).
Iceland Landsvirkjun · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2028
- Renewable match
- 100%
- Rack density
- 60 kW
- PUE
- 1.101.00 ideal · 1.60 typical
- Power source
- Landsvirkjun. Reuses industrial interconnection built for Bakki.
Cooling
Plant
Free air
Liquid
Deployed
Rack density
60 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Four 30 MW stages. Liquid-ready HPC. Zoning still under review.
Network carriers
4On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
2Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Húsavík, Northeastern, Iceland
Bakki industrial area, near Húsavík
66.044°, -17.338° · Europe
Tenants / users
US cloud / AI customer (undisclosed)
Notes
ISK 120bn plan for 100–120 MW. Construction eyed 2027. Developer-stated customer and timetable; treat as pipeline.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.