EverWind Point Tupper
EverWind · Point Tupper industrial site
- Planned IT
- 420 MW
- Free to lease
- —
- $ / kW·mo
- —
- White space
- —
Inventory
100% occupiedPower
420 MWlive
0 MW to lease · 420 MW in use
White space
—total
— free
—
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
—/kW·mo
— industrial
- Per MW·year
- —
- This site · 420 MW
- —
Market industrial · utility tariff × PUE, not colo list price.
- Redundancy
- —
- Opened
- —
- Renewable match
- —
- Rack density
- —
- Voltage
- —
- PUE
- —1.00 ideal · 1.60 typical
- Power source
- New Nova Scotia onshore wind planned alongside the campus (EverWind).
Cooling
Plant
Air / CRAH
Liquid
Not deployed
Rack density
—
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Cooling design not published by the operator for this site; typed air as the neutral default.
Network carriers
0No on-net carriers published.
On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
0No public-cloud on-ramp published.
Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Point Tupper, Nova Scotia, Canada
45.610°, -61.350° · North America
Notes
EverWind announced more than CAD 10B for a 420 MW data centre campus at its Point Tupper site plus wind generation: 95 MW first phase late 2027, 325 MW expansion targeted 2028, subject to conditions (EverWind, Oct 16 2026). Coordinates: Point Tupper (approximate). Source: https://www.globenewswire.com/news-release/2026/10/16/3382650/0/en/everwind-announces-10-billion-investment-in-point-tupper-data-centre-campus-and-renewable-energy-portfolio-across-nova-scotia.html
Compiled from public filings, operator pages, and reporting. Not an official operator specification.