Soya Green Data Center I
Eurus Energy · Wakkanai
- Planned IT
- 10 MW
- Free to lease
- 8 MW
- $ / kW·mo
- $136
- White space
- 42k ft²
Inventory
20% occupiedPower
10 MWlive
8 MW to lease · 2 MW in use
White space
42k ft²total
33k ft² free · 8,333 ft² occupied
3,871 m² · 3,097 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
Power cost
$136/kW·mo
17.2¢ industrial · 18.6¢ after PUE 1.08
- Per MW·year
- $1.6M
- This site · 10 MW
- $16M/yr
- 20 kW rack
- $2,712/mo
5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.
Japan industrial · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2027
- Renewable match
- 100%
- Rack density
- 20 kW
- PUE
- 1.081.00 ideal · 1.60 typical
- Power source
- Behind-the-meter Hokkaido wind. Direct wind interconnect.
Cooling
Plant
Free air
Liquid
Deployed
Rack density
20 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Wind-direct colo at Japan's northern tip. Free-air plus liquid-ready.
Network carriers
3On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Wakkanai, Hokkaido, Japan
Wakkanai, Hokkaido
45.409°, 141.674° · Asia
Tenants / users
Green cloud, AI inference
Notes
Soya Green DC I. Wind-powered northern-Hokkaido campus. Pillar ceremony July 2026.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.