Under construction
Colocation
Liquid cooling
Tier III

Soya Green Data Center I

Eurus Energy · Wakkanai

Planned IT
10 MW
Free to lease
8 MW
$ / kW·mo
$136
White space
42k ft²

Inventory

20% occupied

Power

10 MWlive

8 MW to lease · 2 MW in use

White space

42k ft²total

33k ft² free · 8,333 ft² occupied

3,871 m² · 3,097 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live
Free to lease8 MW
Utility feed
Campus / planned10 MW

Power cost

$136/kW·mo

17.2¢ industrial · 18.6¢ after PUE 1.08

Per MW·year
$1.6M
This site · 10 MW
$16M/yr
20 kW rack
$2,712/mo
3.2¢ cheapdear 22.4¢

5.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $13M/yr less.

Japan industrial · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2027
Renewable match
100%
Rack density
20 kW
Voltage
PUE
1.081.00 ideal · 1.60 typical
Power source
Behind-the-meter Hokkaido wind. Direct wind interconnect.

Cooling

Plant

Free air

Liquid

Deployed

Rack density

20 kW

H100-eq

WUE

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Wind-direct colo at Japan's northern tip. Free-air plus liquid-ready.

Network carriers

3

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

6

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Wakkanai, Hokkaido, Japan

Wakkanai, Hokkaido

45.409°, 141.674° · Asia

Tenants / users

Green cloud, AI inference

Notes

Soya Green DC I. Wind-powered northern-Hokkaido campus. Pillar ceremony July 2026.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.