eStruxture VAN-3 Canada Way
eStruxture · Burnaby
- IT live
- 8 MW
- Free to lease
- 1.0 MW
- $ / kW·mo
- $62
- White space
- 71k ft²
Inventory
87% occupiedPower
8 MWlive
1.0 MW to lease · 7.0 MW in use
White space
71k ft²total
5,909 ft² free · 65k ft² occupied
6,598 m² · 549 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 4.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$62/kW·mo
6.6¢ industrial · 8.4¢ after PUE 1.28
- Per MW·year
- $740k
- This site · 8 MW
- $5.9M/yr
- 12 kW rack
- $740/mo
2.1× the cheapest market (Iceland Landsvirkjun). Same IT load there is $3M/yr less.
BC Hydro Burnaby · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2015
- Renewable match
- 96%
- Rack density
- 12 kW
- PUE
- 1.281.00 ideal · 1.60 typical
- Power source
- BC Hydro. Dual feeds plus on-site diesel. Hydro-heavy British Columbia grid.
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
12 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Burnaby, British Columbia, Canada
4590 Canada Way, Burnaby, BC V5G 1J6
49.249°, -123.001° · North America
Tenants / users
Enterprise, cloud, high-density colo
Notes
25,000 sq ft cabinet space next to BCIT. Burnaby industrial, dual-site with Equinix VA1. 150 kW+ cabinets offered for GPU.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.