eStruxture MTL-4 Kirkland
eStruxture · Kirkland
- IT live
- 12 MW
- Free to lease
- 1.6 MW
- $ / kW·mo
- $42
- White space
- 109k ft²
Inventory
87% occupiedPower
12 MWlive
1.6 MW to lease · 10.4 MW in use
White space
109k ft²total
9,750 ft² free · 100k ft² occupied
10k m² · 906 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 5.5 MW of the utility feed is cooling, conversion, and house load.
Power cost
$42/kW·mo
4.9¢ industrial · 5.8¢ after PUE 1.18
- Per MW·year
- $507k
- This site · 12 MW
- $6.1M/yr
- 10 kW rack
- $422/mo
1.5× the cheapest market (Iceland Landsvirkjun). Same IT load there is $2.1M/yr less.
Hydro-Québec Rate L / West Island · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2008
- Renewable match
- 99%
- Rack density
- 10 kW
- PUE
- 1.181.00 ideal · 1.60 typical
- Power source
- Hydro-Québec. Dual MV inlets plus on-site diesel. ~99.8 percent hydro (Rate L on large sites).
Cooling
Plant
Hybrid
Liquid
Deployed
Rack density
10 kW
H100-eq
—
WUE
—
Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.
Hybrid CRAH plus CDU-fed direct-to-chip loops for high-density AI cabinets.
Network carriers
7On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
4Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Kirkland, Quebec, Canada
17500 Trans-Canada Highway, Kirkland, QC H9J 2X8
45.450°, -73.866° · North America
Tenants / users
Enterprise, cloud, west-island wholesale
Notes
Former Cogeco Peer 1 / Aptum Kirkland. 100,000 sq ft, Uptime Tier III design. West Island industrial, dual-site with downtown.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.