Operational
Colocation
Air cooled
Tier III

eStruxture MTL-1 Square Victoria

eStruxture · Square Victoria

eStruxture MTL-1 Square Victoria facility
Wikimedia Commons / Mtlfiredude · Source
IT live
5 MW
Free to lease
0.7 MW
$ / kW·mo
$43
White space
36k ft²

Inventory

87% occupied

Power

5 MWlive

0.7 MW to lease · 4.3 MW in use

White space

36k ft²total

3,693 ft² free · 32k ft² occupied

3,325 m² · 343 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live5 MW
Free to lease0.7 MW
Utility feed6.3 MW
Campus / planned5 MW

About 1.3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$43/kW·mo

5¢ industrial · 5.9¢ after PUE 1.18

Per MW·year
$517k
This site · 5 MW
$2.6M/yr
12 kW rack
$517/mo
3.2¢ cheapdear 22.4¢

1.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $930k/yr less.

Hydro-Québec Rate L · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2017
Renewable match
99%
Rack density
12 kW
PUE
1.181.00 ideal · 1.60 typical
Power source
Hydro-Québec. Dual MV inlets plus on-site diesel. ~99.8 percent hydro (Rate L on large sites).

Cooling

Plant

Free air

Liquid

Not deployed

Rack density

12 kW

H100-eq

—

WUE

—

Operator has not published WUE. Blank, not zero — air-cooled sites still use some water.

Cool-climate free-air economization most of the year. Closed-loop dry coolers; no evaporative towers.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

4

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Montréal, Quebec, Canada

800 rue du Square-Victoria, Montréal, QC H3C 0B4

45.502°, -73.562° · North America

Tenants / users

Enterprise, media, QIX-adjacent, AWS Direct Connect, 20-plus carriers

Notes

Downtown former Netelligent hall. 25,000 sq ft IT, 5 MW, 30 kW/cabinet. Fibre loop to MTL-2. Largest Canadian-owned colo platform (Fengate, ex-CDPQ).

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.