Operational
Colocation
Liquid cooling
Tier III

Equinix SY7

Equinix · Sydney

IT live
12 MW
Free to lease
1.4 MW
$ / kW·mo
$137
White space
68k ft²

Inventory

88% occupied

Power

12 MWlive

1.4 MW to lease · 10.6 MW in use

White space

68k ft²total

8,182 ft² free · 60k ft² occupied

6,334 m² · 760 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live12 MW
Free to lease1.4 MW
Utility feed15.6 MW
Campus / planned12 MW

About 3.6 MW of the utility feed is cooling, conversion, and house load.

Power cost

$137/kW·mo

14.2¢ industrial · 18.7¢ after PUE 1.32

Per MW·year
$1.6M
This site · 12 MW
$20M/yr
12 kW rack
$1,642/mo
3.2¢ cheapdear 22.4¢

4.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $15M/yr less.

NSW NEM · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2023
Renewable match
70%
Rack density
12 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
Local DNSP plus Equinix renewable contracts.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

0.91 L/kWh

fleet avg · 2025 · 96k m³/yr at 12 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.

Equinix Cooling as a Service: CDU-fed direct-to-chip loops for high-density AI cabinets, alongside IDEC/CRAH for standard interconnection cages.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

6

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Wollongong, New South Wales, Australia

Wollongong, NSW

-34.428°, 150.893° · Oceania

Tenants / users

Networks, cloud, enterprise, finance — Equinix Fabric

Notes

SY7 is an Equinix IBX in the Sydney metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.