Operational
Colocation
Liquid cooling
Tier III

Equinix ST3

Equinix · Santiago

IT live
10 MW
Free to lease
1.5 MW
$ / kW·mo
$87
White space
57k ft²

Inventory

85% occupied

Power

10 MWlive

1.5 MW to lease · 8.5 MW in use

White space

57k ft²total

8,523 ft² free · 48k ft² occupied

5,279 m² · 792 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.5 MW
Utility feed13 MW
Campus / planned10 MW

About 3 MW of the utility feed is cooling, conversion, and house load.

Power cost

$87/kW·mo

industrial · 11.9¢ after PUE 1.32

Per MW·year
$1M
This site · 10 MW
$10M/yr
12 kW rack
$1,041/mo
3.2¢ cheapdear 22.4¢

2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $6.7M/yr less.

Chile SIC · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2020
Renewable match
70%
Rack density
12 kW
Voltage
PUE
1.321.00 ideal · 1.60 typical
Power source
Local grid plus Equinix on-site generators, N+1.

Cooling

Plant

Hybrid

Liquid

Deployed

Rack density

12 kW

H100-eq

WUE

0.91 L/kWh

fleet avg · 2025 · 80k m³/yr at 10 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.

Equinix Cooling as a Service: CDU-fed direct-to-chip loops for high-density AI cabinets, alongside IDEC/CRAH for standard interconnection cages.

Network carriers

6

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

6

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Santiago, Santiago Metropolitan, Chile

Santiago, Chile

-33.452°, -70.672° · South America

Tenants / users

Networks, cloud, enterprise, finance — Equinix Fabric

Notes

ST3 is an Equinix IBX in the Santiago metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.