Equinix ST2
Equinix · Santiago
- IT live
- 10 MW
- Free to lease
- 1.5 MW
- $ / kW·mo
- $90
- White space
- 83k ft²
Inventory
85% occupiedPower
10 MWlive
1.5 MW to lease · 8.5 MW in use
White space
83k ft²total
13k ft² free · 71k ft² occupied
7,742 m² · 1,161 m² free
Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.
Power
About 3 MW of the utility feed is cooling, conversion, and house load.
Power cost
$90/kW·mo
9¢ industrial · 12.3¢ after PUE 1.37
- Per MW·year
- $1.1M
- This site · 10 MW
- $11M/yr
- 5 kW rack
- $450/mo
2.8× the cheapest market (Iceland Landsvirkjun). Same IT load there is $7M/yr less.
Chile SIC · utility tariff × PUE, not colo list price.
- Redundancy
- N+1
- Opened
- 2018
- Renewable match
- 70%
- Rack density
- 5 kW
- PUE
- 1.371.00 ideal · 1.60 typical
- Power source
- Local grid plus Equinix on-site generators, N+1.
Cooling
Plant
Evaporative
Liquid
Not deployed
Rack density
5 kW
H100-eq
—
WUE
1.41 L/kWh
evaporative fleet · 2025 · 124k m³/yr at 10 MW
Operator average for evaporative halls, applied here — not a meter on this site. Equinix 2025 Sustainability Report.
IDEC / chilled-water CRAH, N+1. Campus Cooling as a Service is available for high-density cabinets on request.
Network carriers
6On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.
Clouds
6Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.
Location
Santiago, Santiago Metropolitan, Chile
Santiago, Chile
-33.450°, -70.670° · South America
Tenants / users
Networks, cloud, enterprise, finance — Equinix Fabric
Notes
ST2 is an Equinix IBX in the Santiago metro. Carrier-neutral IBX with Equinix Fabric, Internet Exchange, and cloud on-ramps. Fleet-average PUE was 1.37 in 2025.
Compiled from public filings, operator pages, and reporting. Not an official operator specification.