Operational
Colocation
Air cooled
Tier III

Equinix SP4

Equinix · São Paulo

IT live
10 MW
Free to lease
1.6 MW
$ / kW·mo
$117
White space
83k ft²

Inventory

84% occupied

Power

10 MWlive

1.6 MW to lease · 8.4 MW in use

White space

83k ft²total

13k ft² free · 70k ft² occupied

7,742 m² · 1,239 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live10 MW
Free to lease1.6 MW
Utility feed14 MW
Campus / planned14 MW

About 4 MW of the utility feed is cooling, conversion, and house load.

Power cost

$117/kW·mo

10.8¢ industrial · 16¢ after PUE 1.48

Per MW·year
$1.4M
This site · 10 MW
$14M/yr
5 kW rack
$583/mo
3.2¢ cheapdear 22.4¢

3.4× the cheapest market (Iceland Landsvirkjun). Same IT load there is $9.9M/yr less.

Enel SP · utility tariff × PUE, not colo list price.

Redundancy
N+1
Opened
2014
Renewable match
40%
Rack density
5 kW
PUE
1.481.00 ideal · 1.60 typical
Power source
Enel / AES.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

5 kW

H100-eq

WUE

0.91 L/kWh

fleet avg · 2025 · 80k m³/yr at 10 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.

Chilled-water CRAH. Primary Brazilian interconnection hub.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

6

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

São Paulo, São Paulo, Brazil

Tamboré, Barueri, São Paulo

-23.487°, -46.847° · South America

Tenants / users

Cloud, finance, networks

Notes

Core São Paulo IBX. PTT.br adjacency.

Operator site

Compiled from public filings, operator pages, and reporting. Not an official operator specification.