Operational
Colocation
Air cooled
Tier III

Equinix SG3

Equinix · Singapore

IT live
12 MW
Free to lease
0.4 MW
$ / kW·mo
$232
White space
100k ft²

Inventory

97% occupied

Power

12 MWlive

0.4 MW to lease · 11.6 MW in use

White space

100k ft²total

3,000 ft² free · 97k ft² occupied

9,290 m² · 279 m² free

Free power is unsold critical IT at this building, not utility headroom. Space is computer-room white space.

Power

IT live12 MW
Free to lease0.4 MW
Utility feed16 MW
Campus / planned16 MW

About 4 MW of the utility feed is cooling, conversion, and house load.

Power cost

$232/kW·mo

21.2¢ industrial · 31.8¢ after PUE 1.50

Per MW·year
$2.8M
This site · 12 MW
$33M/yr
5 kW rack
$1,161/mo
3.2¢ cheapdear 22.4¢

6.6× the cheapest market (Iceland Landsvirkjun). Same IT load there is $28M/yr less.

Singapore EMA · utility tariff × PUE, not colo list price.

Redundancy
2N
Opened
2015
Renewable match
15%
Rack density
5 kW
Voltage
PUE
1.501.00 ideal · 1.60 typical
Power source
SP Group.

Cooling

Plant

Air / CRAH

Liquid

Not deployed

Rack density

5 kW

H100-eq

WUE

0.91 L/kWh

fleet avg · 2025 · 96k m³/yr at 12 MW

0 dry2.50 evaporative

Operator fleet average applied to this hall — not a site meter. Equinix 2025 Sustainability Report.

Tropical climate. Chilled-water CRAH with high-efficiency chillers. Liquid cooling limited by water and tropical wet-bulb constraints.

Network carriers

7

On-net and metro carriers typically present at this location, including internet exchanges. Not a full circuit inventory.

Clouds

6

Native regions and typical Direct Connect / ExpressRoute / Interconnect on-ramps at this campus. Availability varies by hall.

Location

Singapore, Singapore, Singapore

Tai Seng, Singapore

1.335°, 103.893° · Asia

Tenants / users

Cloud, finance, networks

Notes

Core Singapore interconnection IBX. Moratorium-era capacity is tight; Johor is the overflow market.

Operator site